Reservoir after the storm, river erosion, there is the risk of bank collapse after a long time, and then let gabion factory'll tell you how to prevent the reservoir bank collapse.
Bank collapse under the circumstances to distinguish: Because the differences across the reservoir shoreline shore field geological conditions, resulting in different types, sizes and rib bank collapse mechanism, so Collapse Treatment should be highly targeted, not blindly carry out or blindly take some prevention engineering measures should remedy, comprehensive way.
Gabions fence can be used for embankment protection, or for the entire riverbed and riverbank protection, more suitable for the original slope relatively slow river. In order to design low water level for the sector, the upper part of slope protection works, the lower part of foot care project. Slope revetment project is trimmed to the original treatment after laying slope filter layer and eco-grid structure of the surface layer mat to prevent water erosion, destruction of wave impact, groundwater level changes and extravasation of slope erosion surface; care Foot project adopts impact materials dumped near the foot of the underwater riverbed, forming a protective layer to prevent water scouring brush, to protect the embankment foundation purposes. The biggest advantage is the Green Bin ecological system, its internal filling is natural stone, there is a gap between the stone, allowing the growth of plants which can also be targeted to the right on which plants sown with plant engineering and slope revetment double effect. Eco-grid mat for the height of 15cm ~ 50cm of combination, mostly separated into mesh with multiple grid spacing box.